- Guide price
- £1,750–£3,000
- Survey
- Free for new and replacement roofs
- Quote
- Fixed, in writing
- Coverage
- England, Wales, Scotland, NI
Bridgend at a glance
- Largest towns
- Bridgend, Maesteg, Porthcawl, Pyle
- Postcode areas
- CF
- Building control
- Bridgend County Borough Council
- Neighbouring areas
- Rhondda Cynon Taf · Neath Port Talbot · Vale of Glamorgan · Swansea
- Guide price region
- Wales (−8% on West Midlands rates)
How much does balcony or terrace waterproofing cost in Bridgend?
Guide prices including VAT at Wales rates. The fixed price comes after a free survey for new and replacement roofs.
| Job | Guide price inc VAT |
|---|---|
| Balcony (12 m²), liquid-applied, scaffold | £1,750–£3,000 |
| Single garage (18 m²), EPDM rubber | £1,450–£2,600 |
| Extension (20 m²), GRP, new deck + insulation | £2,750–£4,950 |
Which flat roofs are common in Bridgend?
Flat roofs in Bridgend sit on 1960s and 1970s link-detached houses with flat-roofed garages and porches, terraced streets with flat-roofed rear kitchens and bathrooms and newer estates where the first extension roofs are now being replaced. Wales averages roughly 1,460 mm of rain a year, among the wettest in Britain, so we design for steady run-off: proper falls, clear outlets and upstands well above the finished roof. Approximate 1991–2020 regional averages based on Met Office data.
Building regulations in Wales
Welsh guidance is that most re-roofing needs building control approval, so it's worth checking whenever more than a quarter of a roof is replaced or repaired. Renovated roofs are upgraded to around 0.16 W/m²K where feasible, and new extension roofs are built to 0.13 W/m²K under the Welsh Approved Document L. In Bridgend the application goes to Bridgend County Borough Council. More on the rules.
How long does it take to waterproof a balcony?
A small balcony is typically waterproofed in two to four working days, plus time for scaffold if it is above ground floor. Liquid and GRP systems need dry weather and cure time between coats, which sets the pace.
The balcony door will be out of use while the membrane is laid and curing, and the room behind may be noisy while old paving or screed is broken out. If the team needs to work through the house, we agree a route and protect floors. Larger terraces with paving or decking take longer, because the finish has to be lifted and reinstated. Resin systems smell while they cure, so nearby windows are best kept closed.
Do I need planning permission for a balcony or roof terrace?
For a new balcony or roof terrace, generally yes. In England, balconies and raised platforms are not permitted development for houses, so a planning application is normally needed, and the other nations have their own rules.
Re-waterproofing an existing, approved balcony that looks the same afterwards does not normally need planning. Building regulations are a separate question. A terrace over a heated room is a thermal element, so replacing most of it can bring insulation requirements and approval. Turning a flat roof into a terrace also raises structural questions, because people, furniture and paving add load, and it needs guarding, such as a balustrade, that meets the regulations. A structural engineer should confirm that the roof can carry the new use.
Listed buildings and conservation areas add another layer of control. Our building regulations page covers approvals, and our planning permission guide covers the planning side.
Which towns in Bridgend do we cover?
Balconies and roof terraces in Bridgend: questions
Which towns in Bridgend do you cover?
All of Bridgend. The main towns have their own pages below, and if yours isn't listed we still cover it: send your postcode and we'll confirm.
How much does balcony or terrace waterproofing cost in Bridgend?
£1,750–£3,000 for a 12 m² balcony in a liquid-applied system including scaffold, at Wales guide rates including VAT. The fixed price comes after a free survey for new and replacement roofs.
Which postcode areas do you cover in Bridgend?
All of Bridgend, including the CF postcode areas. Send your full postcode and we'll confirm.
What is an inverted roof terrace?
It is a terrace where the insulation sits above the waterproofing, held down by paving or ballast. The membrane stays protected and at a steadier temperature.
Can I put decking straight onto my flat roof?
Not directly onto the membrane. Decking needs a supporting system that spreads the load and lets water drain, and the roof must be checked for the extra weight.
Do you install balustrades?
Our work is the waterproofing and drainage. We detail the membrane around balustrade fixings so they stay watertight, and we can advise on where posts should be fixed.
Everything about balconies and roof terraces → · All flat roofing in Bridgend →
