Woking at a glance
- Postcode districts
- GU21, GU22
- Population
- about 103,900 (GeoNames)
- Council area
- Woking Borough Council
- Building approval
- Woking Borough Council building control, or a registered building control approver
- Nearest main town
- Slough, about 13 miles
- Guide price region
- South East (+10% on West Midlands rates)
Why choose EPDM rubber roofing in Woking?
If your Woking roof has been patched more than once and the felt is cracking or blistering, a full replacement in EPDM can be better value than another repair. The rubber stays flexible through hot summers and freezing nights, and the replacement is the right point to bring the insulation up to standard.
Woking's flat roofs are mostly on shops with flat-roofed rear stores below flats, with plenty on lock-up garage blocks on estates too. Much of the South East sits in the drier Thames catchment at roughly 730 mm of rain a year, so the usual failures are at joints, upstands and outlets rather than from sheer volume of rain.
How much does an EPDM rubber roof cost in Woking?
For Woking we use South East rates: £1,750–£3,100 is the guide for a typical 18 m² garage roof in EPDM, VAT included. The fixed price comes after a free survey for new and replacement roofs.
| Job | Guide price inc VAT |
|---|---|
| Single garage (18 m²), EPDM rubber | £1,750–£3,100 |
| Extension (20 m²), EPDM, new deck + insulation | £3,100–£5,350 |
| Porch or bay (4 m²), EPDM | £850–£1,400 |
Do I need building regulations approval to replace a roof with EPDM?
Often, yes. In England, Wales and Northern Ireland, re-covering more than half of a flat roof over a heated room usually counts as renovating a thermal element, so the roof should be insulated towards the renovation standard where that is feasible; in Scotland, the council's building standards service decides whether a building warrant is needed.
An unheated detached garage normally falls outside these rules, and a patch repair is treated differently from a full re-cover.
In practice that means a warm roof: insulation above the deck, a vapour control layer beneath it and the EPDM on top. The extra thickness lifts the finished roof, so at survey we check door thresholds, window cills, wall flashings and upstand heights, aiming for an upstand of about 150 mm above the finished surface. Where approval is needed, we deal with building control or building standards for you. The building regulations page and our warm vs cold roof guide go into more detail.
What's included?
- Written workmanship guarantee, plus manufacturer guarantee registration where available
- Warm-roof insulation and vapour control layer where required
- EPDM membrane fully bonded, in one sheet where the roof size allows
- Strip-out of the old covering, with waste taken away
Building regulations in England
Replacing more than half of a flat roof over a heated room usually counts as renovating a thermal element, so the roof is insulated to around 0.16 W/m²K where that's technically and economically feasible, and the work is notified to building control: the council or a registered building control approver, unless a registered competent person self-certifies it. A roof on a new extension is built to 0.15 W/m²K. Patch repairs, and most unheated detached garages, don't trigger the upgrade. Structural changes, or a new covering that adds 15% or more to the roof's weight, also need approval. More on the rules.
Which nearby areas do we also cover?
EPDM rubber roofing in Woking: questions
Do you cover Woking?
Yes. Woking is part of our Surrey coverage, including postcode districts GU21, GU22. Surveys and roofs are carried out by vetted roofing teams working under S&K Property Investments and Improvement Ltd.
Who checks building regulations for a flat roof in Woking?
Where the work needs approval it goes to Woking Borough Council building control, or a registered building control approver. We tell you at the survey whether your job needs it and deal with the paperwork as part of the quote.
How much does an EPDM rubber roof cost in Woking?
£1,750–£3,100 for a typical 18 m² garage roof in EPDM, at South East guide rates including VAT. The fixed price comes after a free survey for new and replacement roofs.
Can EPDM be laid over an old felt roof?
Sometimes, but we usually recommend stripping old felt first. Overlaying hides any rot or wet insulation underneath, and over a heated room a full replacement is often when insulation has to be added anyway.
How long does it take to fit an EPDM roof?
A single garage typically takes one to two days and an insulated extension roof two to three, weather permitting. Larger roofs, scaffold and complex details add time.
