- Guide price
- £2,600–£4,500
- Survey
- Free for new and replacement roofs
- Quote
- Fixed, in writing
- Coverage
- England, Wales, Scotland, NI
Cardiff at a glance
- Largest towns
- Cardiff, Whitchurch
- Postcode areas
- CF
- Building control
- Cardiff Council
- Neighbouring areas
- Vale of Glamorgan · Caerphilly · Newport · Rhondda Cynon Taf
- Guide price region
- Wales (−8% on West Midlands rates)
How much does a flat roof replacement cost in Cardiff?
Guide prices including VAT at Wales rates. The fixed price comes after a free survey for new and replacement roofs.
| Job | Guide price inc VAT |
|---|---|
| Extension (20 m²), EPDM, new deck + insulation | £2,600–£4,500 |
| Single garage (18 m²), torch-on felt | £1,400–£2,400 |
| Extension (20 m²), GRP, new deck + insulation | £2,750–£4,950 |
| Single garage (18 m²), EPDM rubber | £1,450–£2,600 |
Which flat roofs are common in Cardiff?
Flat roofs in Cardiff sit on terraced streets with flat-roofed rear kitchens and bathrooms, 1960s and 1970s link-detached houses with flat-roofed garages and porches and low-rise post-war blocks of flats. Wales averages roughly 1,460 mm of rain a year, among the wettest in Britain, so we design for steady run-off: proper falls, clear outlets and upstands well above the finished roof. Approximate 1991–2020 regional averages based on Met Office data.
Building regulations in Wales
Welsh guidance is that most re-roofing needs building control approval, so it's worth checking whenever more than a quarter of a roof is replaced or repaired. Renovated roofs are upgraded to around 0.16 W/m²K where feasible, and new extension roofs are built to 0.13 W/m²K under the Welsh Approved Document L. In Cardiff the application goes to Cardiff Council. More on the rules.
How long does it take to replace a flat roof?
A garage or single-storey extension roof is usually stripped and re-covered in one to three working days; larger, higher or more detailed roofs take longer. Weather sets the pace, because the deck must be dry before insulation and membrane go down.
We strip only as much as can be made weathertight that day, so the roof is never left open overnight. Expect noise and some vibration during the strip, a skip on the drive (or on the road with a permit) and ladders or a tower against the house. Rooms below stay usable, though it helps to clear shelves near the ceiling. Resin systems such as GRP smell strongly while they cure, so keep nearby windows closed that day. Two-storey roofs need scaffold, which goes up before we start and comes down after sign-off.
Do I need building regulations approval to replace a flat roof?
Often, yes. Replacing the covering of a flat roof over a heated room is usually treated as renovating a thermal element, which brings insulation requirements and, in most cases, approval.
In England, if more than half of that roof is renovated, the whole roof should be upgraded towards a U-value of 0.16 W/m²K for homes (0.18 for non-domestic buildings) where that is technically, functionally and economically feasible, judged against a simple payback of 15 years. Approval comes from building control or self-certification through a registered competent person scheme. Structural changes, or a covering that adds 15% or more to the roof's weight, also need approval.
The other nations differ: most re-roofing in Wales needs approval, Scotland works through building standards and the building warrant, and in Northern Ireland you contact the district council's building control first. An unheated detached garage is not normally a thermal element. Planning permission is not usually needed if the roof looks much the same afterwards, though listed buildings and conservation areas are different. We handle approvals where needed; see building regulations.
Which towns in Cardiff do we cover?
Flat roof replacement in Cardiff: questions
Which towns in Cardiff do you cover?
All of Cardiff. The main towns have their own pages below, and if yours isn't listed we still cover it: send your postcode and we'll confirm.
How much does a flat roof replacement cost in Cardiff?
£2,600–£4,500 for a 20 m² extension roof in EPDM with a new deck and insulation, at Wales guide rates including VAT. The fixed price comes after a free survey for new and replacement roofs.
Which postcode areas do you cover in Cardiff?
All of Cardiff, including the CF postcode areas. Send your full postcode and we'll confirm.
What time of year is best for a flat roof replacement?
Late spring to early autumn gives the most reliable dry spells, but a roof can be replaced in any season when the forecast allows. Adhesives and resins have minimum application temperatures, so winter work is planned around mild, dry days.
Will a new flat roof be better insulated than the old one?
If it is over a heated room, yes. A full replacement usually has to be upgraded towards current insulation levels where feasible, and we build it as a warm roof with the insulation above the deck.
Can you replace just part of a flat roof?
Sometimes, if the rest is sound and dry. Renovating more than half of a roof over a heated room usually brings the whole roof under the insulation rules, so a full replacement can make more sense.
Everything about flat roof replacement → · All flat roofing in Cardiff →
