Craigavon at a glance
- Postcode districts
- BT62, BT63, BT64, BT65, BT66, BT67
- Population
- about 59,236 (GeoNames)
- Council area
- Armagh City, Banbridge and Craigavon Borough Council
- Building approval
- Armagh City, Banbridge and Craigavon Borough Council building control
- Nearest main town
- Lisburn, about 15 miles
- Guide price region
- Northern Ireland (−12% on West Midlands rates)
When should a flat roof in Craigavon be replaced?
A mineral felt roof laid decades ago may still look intact from the ground in Craigavon, yet have lost its chippings, cracked at the laps and pulled away at the upstands. Those faults let water track under the covering, so by the time a ceiling stain appears, the deck has often been wet for some time.
In a large town like Craigavon, flat roofs are commonly found on bungalows with flat-roofed side extensions and dormers or terraced streets with flat-roofed rear kitchens and bathrooms. Northern Ireland averages roughly 1,150 mm of rain a year, spread over many wet days, so a roof that sheds water quickly to clear outlets lasts far longer than one that holds puddles.
How much does a flat roof replacement cost in Craigavon?
At Northern Ireland guide rates, a 20 m² extension roof in EPDM with a new deck and insulation comes to £2,450–£4,300 including VAT. The fixed price comes after a free survey for new and replacement roofs.
| Job | Guide price inc VAT |
|---|---|
| Extension (20 m²), EPDM, new deck + insulation | £2,450–£4,300 |
| Single garage (18 m²), torch-on felt | £1,350–£2,300 |
| Extension (20 m²), GRP, new deck + insulation | £2,650–£4,750 |
| Single garage (18 m²), EPDM rubber | £1,400–£2,450 |
How long does it take to replace a flat roof?
A garage or single-storey extension roof is usually stripped and re-covered in one to three working days; larger, higher or more detailed roofs take longer. Weather sets the pace, because the deck must be dry before insulation and membrane go down.
We strip only as much as can be made weathertight that day, so the roof is never left open overnight. Expect noise and some vibration during the strip, a skip on the drive (or on the road with a permit) and ladders or a tower against the house. Rooms below stay usable, though it helps to clear shelves near the ceiling. Resin systems such as GRP smell strongly while they cure, so keep nearby windows closed that day. Two-storey roofs need scaffold, which goes up before we start and comes down after sign-off.
What's included?
- Fixed written quote listing the full build-up
- Free survey of the deck, falls, edges and insulation
- Building control handled where needed, plus a written workmanship guarantee
- New deck, firrings and warm-roof insulation where needed
Building control in Northern Ireland
In Northern Ireland, Technical Booklet F1 sets roof insulation at 0.18 W/m²K when a roof over a heated room is renovated or newly built, where that's feasible. The district council's building control should be contacted before work starts, and we prepare the details it asks for. More on the rules.
Which nearby areas do we also cover?
Flat roof replacement in Craigavon: questions
Do you cover Craigavon?
Yes. Craigavon is part of our County Armagh coverage, including postcode districts BT62, BT63, BT64, BT65, BT66, BT67. Surveys and roofs are carried out by vetted roofing teams working under S&K Property Investments and Improvement Ltd.
Who checks building regulations for a flat roof in Craigavon?
Where the work needs approval it goes to Armagh City, Banbridge and Craigavon Borough Council building control. We tell you at the survey whether your job needs it and deal with the paperwork as part of the quote.
How much does a flat roof replacement cost in Craigavon?
£2,450–£4,300 for a 20 m² extension roof in EPDM with a new deck and insulation, at Northern Ireland guide rates including VAT. The fixed price comes after a free survey for new and replacement roofs.
Do I need to be at home while the roof is replaced?
Not for most of the job, as long as the team can reach the roof and there is room for a skip. We ask you to be there at the start to agree the plan and at the end to look over the finished roof.
Will a new flat roof be better insulated than the old one?
If it is over a heated room, yes. A full replacement usually has to be upgraded towards current insulation levels where feasible, and we build it as a warm roof with the insulation above the deck.
