Flat RoofingContractors

Flat roof systems

Liquid-applied roofing in Christchurch

Our liquid roofing service in Christchurch and across Dorset covers overlays of sound roofs, full re-roofs with a new deck and insulation, and repairs to failing details. Every job starts with careful preparation, because a liquid membrane only performs when it is bonded to a clean, dry and stable surface.

Grey liquid waterproofing and reinforcement fleece rolled around a vent pipe on a flat roofComputer-generated example image

Christchurch at a glance

Postcode districts
BH23
Population
about 31,372 (GeoNames)
Council area
BCP Council
Building approval
BCP Council building control, or a registered building control approver
Nearest main town
Bournemouth, about 4 miles
Guide price region
South West (+3% on West Midlands rates)

Why choose a liquid-applied roof in Christchurch?

Liquid roofing suits a roof in Christchurch that is full of penetrations, such as soil pipes, vents, aerial brackets and rooflights, because the liquid flows around each one and cures into a single skin. There are no cut pieces or taped corners to work loose over time.

Christchurch's flat roofs are mostly on 1960s and 1970s link-detached houses with flat-roofed garages and porches, with plenty on shops with flat-roofed rear stores below flats too. The South West averages roughly 1,260 mm of rain a year and many roofs face wind off the Atlantic, so we specify fixings and edge details for wind uplift as well as drainage.

How much does a liquid-applied roof cost in Christchurch?

At South West guide rates, a typical 18 m² garage roof in a liquid-applied system comes to £2,100–£3,350 including VAT. The fixed price comes after a free survey for new and replacement roofs.

JobGuide price inc VAT
Single garage (18 m²), liquid-applied£2,100–£3,350
Balcony (12 m²), liquid-applied, scaffold£1,950–£3,350
Single garage (18 m²), EPDM rubber£1,650–£2,900
Extension (20 m²), EPDM, new deck + insulation£2,900–£5,050

Do building regulations apply if a liquid coating goes over my roof?

They can. In England, Wales and Northern Ireland, re-covering more than half of a roof over a heated room is usually renovation of a thermal element, even when the new membrane goes over the old, so the roof should be insulated towards the renovation standard where feasible; for a Scottish property, the local building standards team will confirm whether a warrant is required.

A minor coating repair to a small area is different from re-covering the whole roof. Where insulation is needed, an overlay is not always practical, because the insulation has to go under a new waterproof layer. In that case we may recommend stripping to the deck, fitting a warm roof and applying the liquid system on top. Where approval applies, we deal with the paperwork; details are on the building regulations page.

What's included?

  • Surface cleaning, repairs and removal of loose material
  • Detailing of upstands, outlets, pipes and corners before the main area
  • Fleece-reinforced liquid membrane applied to the specified thickness
  • Top coat with optional anti-slip finish, and guarantee registration where available

Building regulations in England

Replacing more than half of a flat roof over a heated room usually counts as renovating a thermal element, so the roof is insulated to around 0.16 W/m²K where that's technically and economically feasible, and the work is notified to building control: the council or a registered building control approver, unless a registered competent person self-certifies it. A roof on a new extension is built to 0.15 W/m²K. Patch repairs, and most unheated detached garages, don't trigger the upgrade. Structural changes, or a new covering that adds 15% or more to the roof's weight, also need approval. More on the rules.

Which nearby areas do we also cover?

Liquid-applied roofing in Christchurch: questions

Do you cover Christchurch?

Yes. Christchurch is part of our Dorset coverage, including postcode districts BH23. Surveys and roofs are carried out by vetted roofing teams working under S&K Property Investments and Improvement Ltd.

Who checks building regulations for a flat roof in Christchurch?

Where the work needs approval it goes to BCP Council building control, or a registered building control approver. We tell you at the survey whether your job needs it and deal with the paperwork as part of the quote.

How much does a liquid-applied roof cost in Christchurch?

£2,100–£3,350 for a typical 18 m² garage roof in a liquid-applied system, at South West guide rates including VAT. The fixed price comes after a free survey for new and replacement roofs.

Can liquid roofing be applied in the rain?

No. The surface must be dry, and most systems need a dry window while they cure. Some fast-curing products shorten that window, but the team will not apply onto a damp roof.

What is a fleece-reinforced liquid roof?

It is a liquid membrane with a polyester fleece embedded between coats. The fleece adds strength, helps control thickness and resists cracking where the surface moves slightly.

Other flat roof work in Christchurch

Liquid-applied roofing in Christchurch: get a fixed price

Free survey and a written fixed quote for replacement and new roofs. No obligation.

Call usGet a guide price