Flat RoofingContractors

Flat roof systems

Liquid-applied roofing in Calne

We apply liquid roofing systems in Calne to balconies, garages, extension roofs and roofs crowded with pipes and vents. A free survey comes first, including checks for trapped moisture and adhesion, so we can tell you plainly whether your roof can be overlaid or should be stripped. A fixed written quote follows.

Grey liquid waterproofing and reinforcement fleece rolled around a vent pipe on a flat roofComputer-generated example image

Calne at a glance

Postcode districts
SN11
Population
about 17,274 (GeoNames)
Council area
Wiltshire Council
Building approval
Wiltshire Council building control, or a registered building control approver
Nearest main town
Swindon, about 13 miles
Guide price region
South West (+3% on West Midlands rates)

Why choose a liquid-applied roof in Calne?

If a flat roof in Calne is ageing but still dry, firmly bonded and on a sound deck, a reinforced liquid system can be applied over it. That avoids the cost and mess of a full strip-out, provided the moisture and adhesion checks at survey show the existing roof is fit to build on.

Calne's flat roofs are mostly on terraced streets with flat-roofed rear kitchens and bathrooms, with plenty on lock-up garage blocks on estates too. The South West averages roughly 1,260 mm of rain a year and many roofs face wind off the Atlantic, so we specify fixings and edge details for wind uplift as well as drainage.

How much does a liquid-applied roof cost in Calne?

For Calne we use South West rates: £2,100–£3,350 is the guide for a typical 18 m² garage roof in a liquid-applied system, VAT included. The fixed price comes after a free survey for new and replacement roofs.

JobGuide price inc VAT
Single garage (18 m²), liquid-applied£2,100–£3,350
Balcony (12 m²), liquid-applied, scaffold£1,950–£3,350
Single garage (18 m²), EPDM rubber£1,650–£2,900
Extension (20 m²), EPDM, new deck + insulation£2,900–£5,050

Do building regulations apply if a liquid coating goes over my roof?

They can. In England, Wales and Northern Ireland, re-covering more than half of a roof over a heated room is usually renovation of a thermal element, even when the new membrane goes over the old, so the roof should be insulated towards the renovation standard where feasible; for a Scottish property, the local building standards team will confirm whether a warrant is required.

A minor coating repair to a small area is different from re-covering the whole roof. Where insulation is needed, an overlay is not always practical, because the insulation has to go under a new waterproof layer. In that case we may recommend stripping to the deck, fitting a warm roof and applying the liquid system on top. Where approval applies, we deal with the paperwork; details are on the building regulations page.

What's included?

  • Fleece-reinforced liquid membrane applied to the specified thickness
  • Surface cleaning, repairs and removal of loose material
  • Detailing of upstands, outlets, pipes and corners before the main area
  • Primer matched to the substrate

Building regulations in England

Replacing more than half of a flat roof over a heated room usually counts as renovating a thermal element, so the roof is insulated to around 0.16 W/m²K where that's technically and economically feasible, and the work is notified to building control: the council or a registered building control approver, unless a registered competent person self-certifies it. A roof on a new extension is built to 0.15 W/m²K. Patch repairs, and most unheated detached garages, don't trigger the upgrade. Structural changes, or a new covering that adds 15% or more to the roof's weight, also need approval. More on the rules.

Which nearby areas do we also cover?

Liquid-applied roofing in Calne: questions

Do you cover Calne?

Yes. Calne is part of our Wiltshire coverage, including postcode districts SN11. Surveys and roofs are carried out by vetted roofing teams working under S&K Property Investments and Improvement Ltd.

Who checks building regulations for a flat roof in Calne?

Where the work needs approval it goes to Wiltshire Council building control, or a registered building control approver. We tell you at the survey whether your job needs it and deal with the paperwork as part of the quote.

How much does a liquid-applied roof cost in Calne?

£2,100–£3,350 for a typical 18 m² garage roof in a liquid-applied system, at South West guide rates including VAT. The fixed price comes after a free survey for new and replacement roofs.

Is liquid roofing the same as a roof paint?

No. A proper liquid-applied membrane is built to a specified thickness and usually reinforced with fleece, while roof paints and simple coatings are much thinner and mainly used to extend the life of an existing covering.

What is a fleece-reinforced liquid roof?

It is a liquid membrane with a polyester fleece embedded between coats. The fleece adds strength, helps control thickness and resists cracking where the surface moves slightly.

Other flat roof work in Calne

Liquid-applied roofing in Calne: get a fixed price

Free survey and a written fixed quote for replacement and new roofs. No obligation.

Call usGet a guide price