Why choose torch-on felt roofing in Holywood?
On larger roofs in Holywood with poor falls, torch-on felt pairs well with tapered insulation, which builds the fall into the insulation boards. That deals with ponding properly while adding insulation, rather than patching the low spots and waiting for the next leak.
In and around Holywood, flat roofs are typically found on terraced streets with flat-roofed rear kitchens and bathrooms, and on 1930s semis with flat-roofed garages and kitchen extensions. Northern Ireland averages roughly 1,150 mm of rain a year, spread over many wet days, so a roof that sheds water quickly to clear outlets lasts far longer than one that holds puddles.
How much does a torch-on felt roof cost in Holywood?
For Holywood we use Northern Ireland rates: £1,350–£2,300 is the guide for a typical 18 m² garage roof in torch-on felt, VAT included. The fixed price comes after a free survey for new and replacement roofs.
| Job | Guide price inc VAT |
|---|---|
| Single garage (18 m²), torch-on felt | £1,350–£2,300 |
| Extension (20 m²), felt, new deck + insulation | £2,400–£4,100 |
| Block of flats (150 m²), felt + insulation + scaffold | £13,700–£23,950 |
| Single garage (18 m²), EPDM rubber | £1,400–£2,450 |
| Extension (20 m²), EPDM, new deck + insulation | £2,450–£4,300 |
Should I choose torch-on felt or a different flat roof system?
Choose torch-on felt when you want a proven, layered system at a sensible price, particularly on larger roofs, blocks of flats and commercial buildings where several layers give useful redundancy. It is a weaker choice where hot works are hard to manage safely.
For: generally lower cost per square metre; two or three layers, so a single defect in one layer need not cause a leak; tough mineral finish; long track record and a British Standard code of practice; repairs can be made with compatible materials.
Against: needs a naked flame unless a cold-applied or self-adhesive alternative is used; shorter typical life than EPDM or GRP; the finish is functional rather than decorative; more laps to detail than a single sheet.
On small domestic roofs near timber, EPDM avoids the torch entirely. GRP gives a harder, neater surface. For an overlay, a liquid-applied system is often simpler. Large commercial roofs may suit single-ply, and older buildings may suit mastic asphalt. See our comparison guide.
What's included?
- Vapour control layer and warm-roof insulation where needed
- Hot-works checks and fire watch on every torch-on job
- Strip-off of the existing roof covering and removal of waste
- Deck inspection with replacement of damaged boards
Building control in Northern Ireland
In Northern Ireland, Technical Booklet F1 sets roof insulation at 0.18 W/m²K when a roof over a heated room is renovated or newly built, where that's feasible. The district council's building control should be contacted before work starts, and we prepare the details it asks for. More on the rules.
Which nearby areas do we also cover?
Torch-on felt roofing in Holywood: questions
Do you cover Holywood?
Yes. Holywood is part of our County Down coverage, including postcode districts BT18. Surveys and roofs are carried out by vetted roofing teams working under S&K Property Investments and Improvement Ltd.
Who checks building regulations for a flat roof in Holywood?
Where the work needs approval it goes to Ards and North Down Borough Council building control. We tell you at the survey whether your job needs it and deal with the paperwork as part of the quote.
How much does a torch-on felt roof cost in Holywood?
£1,350–£2,300 for a typical 18 m² garage roof in torch-on felt, at Northern Ireland guide rates including VAT. The fixed price comes after a free survey for new and replacement roofs.
How long does it take to lay a torch-on felt roof?
A garage roof typically takes one to two days and an insulated extension two to three. Larger roofs and blocks are phased over longer, with each area made weathertight before the team leaves.
Why does my felt roof have blisters?
Blisters usually form when moisture or air trapped beneath the felt expands in the sun. A few small, intact blisters may be monitored, but widespread or split blisters point to a repair or replacement.